90% Off! Kemit Navy Blazer Single Button
33.00 USD(tax included)
/59.40 USD (Excluding tax)
Sales unit: 1 piece
Application number: / Manufacturer: / Model number: m69309153472 / JAN code: / AS ONE / NAVIS Product number:
| Application number | |
|---|---|
| Manufacturer | |
| Model number | m69309153472 |
| JAN code | |
| Sales unit | 1 piece |
| Price | 33.00 USD (tax included) / 59.40 USD (Excluding tax) |
*Additional shipping fees will be charged for this product in Okinawa Prefecture, remote islands, some other areas, and mountain areas. Please note that we may not be able to deliver depending on the region. If we are unable to deliver your order after placing your order, Askul will contact you.
Please note the following points as this item is directly shipped.
- Additional shipping fees will be charged for this product in Okinawa Prefecture, remote islands, some other areas, and mountain areas. Please note that we may not be able to deliver depending on the region. If we are unable to deliver your order after placing your order, Askul will contact you.
- This product may not come with a delivery note issued by Askul. Customers who wish to receive a delivery note issued by Askul can print it out as a PDF file from the usage history on this site after receiving the product.
- It is not delivered in Askul cardboard or a bag.
- We cannot accept changes, cancellations, returns, or exchanges after the order has been placed due to the customer's convenience.
- If we discover after placing an order that the product cannot be delivered, we may cancel your order.
- If it becomes clear after placing your order that the item is temporarily out of stock, it will be delivered as soon as it becomes available.
This image is a representative image. Please check the specifications for details.
Stock: Slightly
Direct delivery product
Shipping charges for products from this shipping source will be borne by us.
58 USD (tax included)
/ 63.8 USD (Excluding tax)
Product details
| Product features | BrandKemit Item conditionAlmost new Used a few times, but doesn’t look used Ships fromKanagawa |
||
|---|---|---|---|
| Manufacturer name | - | Brand name | - |
| remarks | [About returns] We cannot accept returns due to customer's convenience. | ||
| Product details |
Special clearance price. Thank you for your understanding. 90% off the original price. Don't miss this opportunity! Single-button navy blazer, suitable for three seasons. - Color: Navy - Brand: Kemit - Style: Blazer - Design: Single-button - Pockets: 2 front pockets - Outer fabric: 84% Wool, 16% Mohair; Lining: 100% Cupro This beautiful blazer from Kemit, a brand renowned for its pursuit of the best size for Japanese people and its ability to create clothing that naturally forms a beautiful silhouette, is in near-unused condition, having only been worn once or twice. Size 48 (L), measurements are: Shoulder width 45cm, Body width 42cm, Length 74cm, Sleeve length 62cm, Sleeve length from center back 78cm. Thank you for looking. Click here for the manufacturer's site Easy to find furniture and interiors! Click here for Askul's general furniture TOP page. Consultation on layout, various construction works, and delivery dates! Click here for the ASKUL office creation service. |
||
※Disclaimer
In this service, we strive to display the latest product information on the site, but product standards and specifications (capacity, packaging, raw materials, country of origin, etc.) may change due to manufacturer circumstances. For this reason, the product information displayed on the site may differ from the actual product you receive, so please be sure to check the product label and precautions of the product you receive before use. If you require further product information, please contact the manufacturer. Also, the notation "set" in the sales unit does not guarantee delivery in a box. Thank you for your understanding.
Best Selling Ranking
Customer reviews
There are no reviews posted. We look forward to hearing your review comments.
Features related to this product
-
Fill the Blank Spaces Coloring Book For Taylor Swift Fans. NEW.
-
Vintage 1993 McCall's 6493 Kids T-Shirt Tank Top Shorts Hat Sewing Pattern 3-5
-
Better Homes & Gardens Adult & Child Heart Rockers Project Plan No. 50483
-
Marshmallows Beads 2 Pcs Focal Beads Jelly Beaded Pen Jewelry Making Crafts
-
Kodak Gloss Photo Printer Paper 8.5x11 82 Sheets and 4x6 Gloss photo paper 15 pc
TV/Audio/Camera categories
Hobby/Musical Instruments/Art Categories
Home appliances and air conditioning categories
The product has been added to your cart
- Total items
-
piece
- Total Amount
-
(tax included)







